Bid No. 23-474 & 23-475 ERHS & SMHS CTE Canopies
23-474 Santa Maria High School- The addition of a steel framed metal canopy for the existing SMHS CTE building. 23-475 Ernest Righetti High School- The addition of a steel framed metal canopy for Building I, ERHS CTE. Demolition of existing CMU exterior storage with metal roof and construction of new CMU walls/gates/covering and associated site work.
Addenda
(click to expand/collapse)
Name | Size | |||
23-474 & 23-475 Addendum 03 05.08.24 Description | 245.3 KB | |||
23-474 and 23-475 Addendum 1 04316 | 135.8 KB | |||
23-474 and 23-475 Addendum 2 042324 | 132.7 KB | |||
23-474 and 23-475 Addendum 4 | 293.0 KB | |||
23-474 and 23-475 Addendum 5 | 139.6 KB |
Addendum 8
(click to expand/collapse)
Name | Size | |||
23-474 & 23-475 Addendum 08 | 6.4 MB |
Addendum No. 6
(click to expand/collapse)
Name | Size | |||
23-474 & 23-475 Addendum 06 07.12.24 Description | 193.4 KB | |||
23-474 & 23-475 Addendum 06 ERHS Drawings | 7.4 MB | |||
23-474 & 23-475 Addendum 06 SMHS Drawings | 5.9 MB | |||
23-474 & 23-475 Addendum 06 Specifications | 1.9 MB |