Goleta Sanitary District: Biosolids and Energy Phase 1 Project
The work shall be as follows: Construction and equipping of a new 500,000 gallon 50-ft diameter prestressed concrete digester; Furnishing and installing a 160-kW cogeneration system with integrated digester gas cleaning system; Improvement to the existing digester heating system; Yard piping associated with the above work; Electrical and Instrumentation and Control Work associated with the above work; Demolition work associated with the above work.
Addendum 1 3-14-23
(click to expand/collapse)
Name | Size | |||
Biosolids and Energy Addendum No. 1 | 344.8 KB | |||
E603 | 330.6 KB |
Addendum 2 4-14-23
(click to expand/collapse)
Name | Size | |||
Biosolids and Energy Addendum No. 2 | 420.3 KB | |||
ID01-ADDENDUM NO 2 | 186.8 KB | |||
Item 1 | 13.1 MB | |||
Item 2 | 241.5 KB | |||
Item 3 | 381.1 KB | |||
Item 4 | 2.9 MB |
Addendum 3 4-18-23
(click to expand/collapse)
Name | Size | |||
Biosolids and Energy Addendum No. 3 | 334.1 KB |
Addendum 4 4-21-23
(click to expand/collapse)
Name | Size | |||
Biosolids and Energy Addendum No. 4 | 602.2 KB |
Record Drawings
(click to expand/collapse)
Name | Size | |||
1989 Upgrade | 84.0 MB | |||
1991 Reclamation Plant Record Drawings Combined | 42.5 MB | |||
2011 Upgrade_Demolition | 6.1 MB | |||
2011 upgrade_Drawing Index | 545.4 KB | |||
2011 Upgrade_Electrical | 18.9 MB | |||
2011 Upgrade_General | 8.9 MB | |||
2011 upgrade_HVAC | 14.9 MB | |||
2011 Upgrade_Instrumentation | 9.5 MB | |||
2011 Upgrade_Mechanical | 13.2 MB | |||
2011 Upgrade_Structural | 3.4 MB |