Goleta Sanitary District: Biosolids and Energy Phase 1 Project
Status
Bidding Closed
Prebid Date | 3/30/23 10:00am |
Bid Date | 5/3/23 2:00pm |
Company & Contacts
Location
One William Moffett Place, Goleta, California 93117
This project includes the furnishing of all labor, materials and equipment for the construction of the Biosolids and Energy Phase 1 Project, together with all appurtenant work and facilities, as shown on the Drawings and as specified herein. The project includes but not limited to demolition, relocation of utilities including a primary effluent pipeline, construction of a reinforced concrete digester, procurement and installation of a complete electrical generation system, upgrades to the digester heating system, electrical upgrades, and instrumentation and control upgrades as detailed by the project’s Bid List and Contract Documents. All materials furnished shall be new.
Engineer's Cost Estimate: $10.5 to $11.5 million