Goleta Sanitary District: Biosolids and Energy Phase 1 Project
The work shall be as follows: Construction and equipping of a new 500,000 gallon 50-ft diameter prestressed concrete digester; Furnishing and installing a 160-kW cogeneration system with integrated digester gas cleaning system; Improvement to the existing digester heating system; Yard piping associated with the above work; Electrical and Instrumentation and Control Work associated with the above work; Demolition work associated with the above work.
Plan Holders
Date | Company | Contact |
3/22/23 12:17 pm |
ConstructConnect
3825 Edwards Road, Ste. 800 Cincinnati, OH 45209 |
John Fermiza
Tel: 3236025079
|
3/16/23 11:33 am |
DN Tanks
351 Cypress Lane El Cajon, CA 92020 |
Valerie Milbourne
Sales & Estimating Administrator
Tel: 6192704525
|
3/21/23 9:13 am |
GSE Construction Company Inc.
7633 Southfront Rd. Ste. 160 Livermore, CA 94551 |
Vina Ontiveros
Contract Manager
Tel: 9254470292
|
3/20/23 10:39 am |
Gateway Pacific Contractors, Inc.
8055 Freeport Blvd Sacramento, CA 95832 |
Evan Lundin
President
Tel: 916-665-4100
Fax: 916-665-4119
|
3/16/23 8:09 am |
P&J Electric, Inc.
PO Box 303 Tehachapi, CA 93581 |
Peter Glasner
Tel: 661-822-6217
|
3/20/23 2:35 pm |
Pacific Hydrotech Corporation
314 e 3rd st 314 e 3rd st perris, CA 92570 |
Meztly Ramirez
Bid Coordinator
Tel: 9519438803
Fax: 9519431093
|
4/26/23 12:56 pm |
Precision Welding
5790 Thornwood Dr Ste. B Goleta, CA 93117 |
Brian Rochlitzer
Tel: 805-683-1848
Fax: 805-964-6653
|