SEWER MAIN EXTENSION & SEPTIC TANK ABANDONMENT PROJECT
Extend existing sewer main 375 LF and connect to existing building sewers; additional minor water line work.
Drawings
(click to expand/collapse)
Name | Size | ||
Final plan set SBNC with signature for bid | 16.2 MB | ||
SBNC Meter Relocation Plan - Offsite Sheet-Updated_8-12-23 | 50.0 KB | ||
SBNC Onsite Water Service Line Plan | 173.9 KB |