Building D South Drainage Improvement Project, Re-Bid

Scope of Work- Project Description: Install new drainage infrastructure to move water from downspouts away from building. Includes catch basins, drain pipe and adjustments to existing downspout to direct water into catch basins. Bid Alternate: Install waterproof membrane and blind French drain system to drywell.
Plans (click to expand/collapse)