Ernest Righetti High School Cafeteria Counter Upgrade, 24-482
The removal and replacement of the existing stainless steel cafeteria counter, concrete curbing, windows, automatic roll-up security shutters, and modifications to existing restrooms including related electrical, data, plumbing, and controls. Finishes include concrete floor repairs and polishing, wall repair, and painting as more fully described in the bid documents.
Documents
(click to expand/collapse)

Name | Size | ||
03-124738_103_A DSA Stamped 030525 | 108.0 KB | ||
03-124738_SPC_A DSA Stamped 030525 | 3.5 MB | ||
24-482 ERHS Cafeteria Counter Upgrades Bid Documents | 2.7 MB |